The Mersey Docks and Harbour (Princes River Berth) Revision Order 1988
© Crown Copyright 1988 Statutory Instruments printed from this website are printed under the superintendence and authority of the Controller of HMSO being the Queen's Printer of Acts of Parliament. The legislation contained on this web site is subject to Crown Copyright protection. It may be reproduced free of charge provided that it is reproduced accurately and that the source and copyright status of the material is made evident to users. It should be noted that the right to reproduce the text of Statutory Instruments does not extend to the Queen's Printer imprints which should be removed from any copies of the Statutory Instrument which are issued or made available to the public. This includes reproduction of the Statutory Instrument on the Internet and on intranet sites. The Royal Arms may be reproduced only where they are an integral part of the original document. The text of this Internet version of the Statutory Instrument which is published by the Queen's Printer of Acts of Parliament has been prepared to reflect the text as it was Made. A print version is also available and is published by The Stationery Office Limited as the The Mersey Docks and Harbour (Princes River Berth) Revision Order 1988, ISBN 0110881249. The print version may be purchased by clicking here. Braille copies of this Statutory Instrument can also be purchased at the same price as the print edition by contacting TSO Customer Services on 0870 600 5522 or e-mail:customer.services@tso.co.uk. Further information about the publication of legislation on this website can be found by referring to the Frequently Asked Questions. To ensure fast access over slow connections, large documents have been segmented into "chunks". Where you see a "continue" button at the bottom of the page of text, this indicates that there is another chunk of text available. | ||||||
HARBOURS, DOCKS, PIERS AND FERRIES The Mersey Docks and Harbour (Princes River Berth) Revision Order 1988
1.(1) This Order may be cited as the Mersey Docks and Harbour (Princes River Berth) Revision Order 1988 and shall come into force on 10th November 1988. (2) This Order shall be included among the enactments which may be cited together as the Mersey Docks and Harbour Acts and Orders 1857 to 1988.
2.(1) In this Order, unless the context otherwise requires, "the Act of 1971" means the Mersey Docks and Harbour Board (Ore Berth) Act 1971 [3]; "the Company" means The Mersey Docks and Harbour Company; "the deposited plan" and "the deposited sections" mean respectively the plan and sections prepared in duplicate, signed by an Assistant Secretary of the Department of Transport and marked "Plan and sections referred to in the Mersey Docks and Harbour (Princes River Berth) Revision Order 1988", of which one copy is deposited at the offices of the Department of Transport, and one copy at the head office of the Company; "the existing enactments" means the Mersey Docks and Harbour Acts and Orders 1857 to 1988; "the level of high water" means the level of mean high water springs; "the limits of deviation" means the limits of deviation shown on the deposited plan; "tidal work" means so much of any work as is on, under or over tidal waters or tidal lands below the level of high water; "Trinity House" means the Corporation of Trinity House of Deptford Strond; "work" means any of the works authorised by this Order, and includes any part of those works. (2) This Order is to be read as if the words "or thereabouts" were inserted after each measurement mentioned in article 3 (Power to construct, etc., works) of this Order.
3.(1) Subject to the provisions of this Order, the Company may within the lines and situations shown on the deposited plan and according to the levels shown on the deposited sections and within the limits of deviation construct and maintain in the river Mersey and on the bed, banks and shores thereof, the works authorised by this article: Work No. 1An adjustable bridge 8 metres wide commencing 70 metres north of the return wall at the entrance to West Waterloo Dock, extending in a southerly direction for 85 metres and supported at its southernmost end by buoyancy pontoons. Work No. 2A passenger access gangway 2 metres wide commencing 40 metres south of the return wall at the entrance to West Waterloo Dock on the eastern quay face of the said entrance thereof and extending in a southerly direction for 62 metres. Work No. 3A line of seven berthing and mooring fenders spaced at intervals commencing 27 metres south of the return wall at the entrance to West Waterloo Dock and parallel to the eastern quay face of the entrance to West Waterloo Dock extending in a southerly direction for a distance of 95 metres. (2) The Company may from time to time within the limits of deviation renew, enlarge, alter and reconstruct temporarily or permanently the works.
4. Subject to the provisions of this Order, the Company may from time to time, for the purposes of or in connection with or incidental to the construction, maintenance and use of the works authorised by article 3 (Power to construct, etc., works) of this Order, erect, construct, and maintain all such works and conveniences as they may from time to time deem necessary or convenient.
5. In constructing the works the Company may deviate laterally from the lines or situations thereof shown on the deposited plan to the extent of the limits of deviation and may deviate vertically from the levels shown on the deposited sections to any extent not exceeding six metres upwards and to such extent downwards as may be found necessary or convenient.
6. The following provisions of the Act of 1971 shall apply in respect of the works authorised by this Order (including any works of reconstruction under article 3(2) hereof) as they apply in respect of the works authorised by that Act Section 9 (Tidal works not to be constructed without approval of Secretary of State); Section 10 (Provision against danger to navigation); Section 11 (Abatement of works abandoned or decayed); Section 12 (Survey of tidal works); Section 13 (Lights on tidal works during construction); and Section 14 (Permanent lights on tidal works).
7. The works, and the bed, banks and shores of the river Mersey on which the works are constructed, shall for all purposes, so far as is not inconsistent with the provisions of this Order, be deemed to be docks and lands of the Company within the meaning of the existing enactments or any of them.
8. If the works are not completed within 6 years from the coming into force of this Order or such extended time as the Secretary of State may on the application of the Company allow, then on the expiration of that period or such extended time (as the case may be) the powers by this Order granted to the Company for constructing and maintaining the works shall cease except as to so much thereof as shall then be completed.
9.(1) In section 10 of the Act of 1971 (provision against danger to navigation) in subsection (2) for "one hundred pounds" there shall be substituted "the statutory maximum". (2) In section 13 of that Act (lights on tidal works during construction) in subsection (2) for "one hundred pounds" there shall be substituted "the statutory maximum". (3) In subsection 14 of that Act (permanent lights on tidal works) in subsection (2) for "one hundred pounds" there shall be substituted "the statutory maximum".
(This note is not part of the Order)
ISBN 0 11 088124 9 Notes: [1] 1964 c. 40; section 14 and Schedule 3 were amended by the Transport Act 1981 (c. 56), section 18 and Schedule 6, paragraphs 2 to 4 and 14. back |
|
|
||
| Other UK SIs | Home | National Assembly for Wales Statutory Instruments | Scottish Statutory Instruments | Statutory Rules of Northern Ireland | Her Majesty's Stationery Office | ||
|
|
||
| We welcome your comments on this site | © Crown copyright 1988 | Prepared 20th September 2000 |